Buchi Rotavapo R-100 Manuel d'utilisateur Page 21

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 60
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 20
BÜCHILabortechnikAG Installation|5
OperationManualRotavapor®R100 21/60
5 Installation
5.1 Installationsite
Theinstallationsitemustmeetthefollowingrequirements:
Firmandlevelsurface
Spacerequirements:atleast620mmx510mm(WxD)
Ifdistillingundervacuum,theremustbeafumehoodavailable.
Whereverpossible,theRotavapor®R100shouldbesetupinsidethefumehood.
Ifthatisnotpossibleforreasonsofspace,itcanalsobesetupoutsideifthesafety
guard(optionalaccessory)isfittedandtheresidualvaporsarefedintothefume
hood.
5.2 Mountingtherotarydriveunit
IMPORTANT
Riskofpropertydamageduetorotarydriveunitfallingoff
u Makesurethatthescrewforfixingtherotarydriveunitengagessecurelyinthe
grooveinthetowermount.
u Sliderotarydriveunit(2)ontothetowermount(1).
u Tightenscrew(4)tolocktherotarydriveunitinthegroove(3)sothatitcannotbe
pulledoff.
u Tightenthelockinglever(5)fortheimmersionangle.
u Checkthattherotarydriveunitcannotbepulledoffortwisted.