Buchi Multivapo P-12 Manuel d'utilisateur Page 39

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 76
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 38
5 Putting into operation
39 Multivapor™ Operation Manual, Version E
5.3 Commissioning the Multivapor basic instrument
5.3.1 Commissioning the crystal rack
Fig. 5.21: Installation of the crystal rack onto the heating plate
Remove any particles from the heating plate and the bottom side of the crystal rack. Place the rack
onto the heating plate with the indentation to the front.
Put the rack back on the instrument - the three pins have to be aligned with the openings in the
bottom of the rack and the notches 1 on the rack have to point to the front side (a little left from the
middle) of the instrument.
Pull and hold the locking device 2.
Turn the rack a little counter clockwise and let the locking device go 3.
Turn the rack further counter clockwise, until the locking device snaps into place.
Optionally you can fix the the rack with the supplied four screws 2.
Check the rack for a tight mounting!
Vue de la page 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 75 76

Commentaires sur ces manuels

Pas de commentaire