
BÜCHILabortechnikAG Installation|5
PrepChromC700 47/110
5.5 Column,preparation
5.5.1 Flash/prepcolumn,preparation
CAUTION
Riskofchemicalburnsduetowrongsetpressureorawrongse
lectedcolumn.
Thecolumncanburstandseriousinjuriescanresult.
u Wearprotectivegoggles.
u Wearprotectivegloves.
u Wearprotectiveclothes.
Preliminarytasks
u Installtheloopontheportno2and5ofthe6wayelectricalvalve.
• 5.2.2 Tubing general, installation [} page41]
u Installthetubebetweentheuppercolumnholderandportno3ofthe6
wayelectricalvalve.
u Installthetubebetweenthelowercolumnholderandtheinletofthe
UVDetectormodule.Thelongnutofthetubemustbeconnectedwiththe
column.
Tasks
u Tightenthelowerknurledknob(4).
u Positionthecolumn(5)onthelowerholder(3).
• Slightlypushthecolumnontothelowerconnection.
u Movetheupperholder(2)downontothecolumnandtightenthePEEK
adapter(6).
Commentaires sur ces manuels